Skip to product information
16 C13 and 2 C19 208/240V outlets distribute AC power to connected equipment
Digital ammeter for on-site load monitoring helps prevent power overloads
1.8 m cord with NEMA L6-30P single-phase input connects to AC power source
Metered PDU installs in 2U of rack space using the included mounting brackets
Compliant with the Federal Trade Agreements Act (TAA) for GSA Schedule purchases
2-year limited warranty
Tripp Lite PDU Metered 16 C13 2 C19 Outlets 208/240V 5.8kW L6-30P 2URM TAA - Metered - NEMA L6-30P - 16 x IEC 60320 C13, 2 x IEC 60320 C19 - 230 V AC - 2U - Horizontal - Rack-mountable - TAA Compliant - PDUMH30HV6
$442.18
Digital ammeter for on-site load monitoring helps prevent power overloads
1.8 m cord with NEMA L6-30P single-phase input connects to AC power source
Metered PDU installs in 2U of rack space using the included mounting brackets
Compliant with the Federal Trade Agreements Act (TAA) for GSA Schedule purchases
2-year limited warranty